- Shantui
- Shandong,China
- About 10 days
- 100000PCS PER MONTH
Double Low Roller For Shantui Bulldozer Undercarriage Parts Advantages:
• Quality guarantee
• Technical support
• Gather different parts into one container
• Unobstructed communion
• Delivery Merchandise in time
• LCL is acceptable
• OEM parts number guidance
• Producing according to drawings.
Double Low Roller For Shantui Bulldozer Undercarriage Parts
Material | 40SiMnTi |
Finish | Smooth |
Colors | Black or yellow |
Technique | Forging casting |
Surface Hardness | HRC48-54,deepth:4mm-10mm |
Warranty time | 1500 hour, or 9 Months |
Certification | ISO9001-9002 |
FOB Price | FOB Xiamen USD 200-800/Piece |
MOQ | 2 piece |
Delivery Time | Within 30 days after contract established |
Production Process of the Double Low Roller For Shantui Bulldozer Undercarriage Parts
Excavator and Bulldozer Track Roller
Related products:
Track link, track chain, track link assy, track group, track link with shoes.
Track roller, bottom roller, lower roller.
Carrier roller, top roller, upper roller.
Sprocket, driving wheel,
Idler, front idler, rear idler,
Track adjuster, track tension spring, track cylinder, track cylinder assembly.